PhalangeRestaurant Inspection Lookup

Just Salad

15 recorded inspections in Boston — the full stored timeline, newest first, with the latest inspection's violation items — from the city's official open data.

Data synced Nov 26, 2026 · newest inspection Nov 19, 2026

Source: City of Boston Inspectional Services Department inspection records. Records as of Nov 19, 2026. An inspection is a snapshot of one day.

185 FRANKLIN ST, BOSTON MA 02110

License no. 519817

Category Eating & Drinking w/ Take Out

What the record shows

The share of inspections recorded as Pass did not change by the reporting threshold between Dec 27, 2023 – Sep 2, 2025 and Oct 2, 2025 – Nov 18, 2026: 28.6% (2 of 7) versus 33.3% (2 of 6). The difference was 4.8 percentage points. This describes recorded inspection outcomes, not current conditions.

The outcome recorded on Nov 18, 2026 was Failed; the preceding comparable record on Apr 8, 2026 showed Passed. Read both reports for the cited findings. This change does not establish present conditions.

Inspection history

  1. LatestFailed

    1 violation item in this inspection

    (A)(1) Time/Temperature Control for Safety Food Hot and Cold Holding (P)***
    590.003/3-501.16-P1 · Fail

    Chicken and sweet potato in hot holding unit ranging from 105F-100F. Removed. Ensure proper hot holding of 135F or above.

  2. Passed

    5 violation items in this inspection

    Miscellaneous Sources of Contamination (C)*
    590.003/3-307.11-C · Pass

    Employee obsevred storing food container on trash can during prep process of cucumbers. Discontinue.

    Nonfood Contact Surfaces (C)*
    590.004/4-602.13-C · Pass

    Excess water under three bay sink and in prep area. Clean to remove

    Handwashing Sinks Installation (Pf)**
    590.005/5-202.12-PF · Pass

    Front counter hand sink at 88F after multiple minutes. Ensure water is 100F. Hot water availabe at other locations.

    Using a Handwashing Sink-Operation and Maintenance (Pf)**
    590.005/5-205.11-PF · Pass

    Prep area hand sink is blocked by a prep table. Ensure hand sink is accessible.

    Wall and Ceiling Coverings and Coatings (C)*
    590.006/6-201.16-C · Pass

    Missing ceiling tile in storage room area. Replace.

  3. Failed

    5 violation items in this inspection

    Miscellaneous Sources of Contamination (C)*
    590.003/3-307.11-C · Fail

    Employee obsevred storing food container on trash can during prep process of cucumbers. Discontinue.

    Nonfood Contact Surfaces (C)*
    590.004/4-602.13-C · Fail

    Excess water under three bay sink and in prep area. Clean to remove

    Handwashing Sinks Installation (Pf)**
    590.005/5-202.12-PF · Fail

    Front counter hand sink at 88F after multiple minutes. Ensure water is 100F. Hot water availabe at other locations.

    Using a Handwashing Sink-Operation and Maintenance (Pf)**
    590.005/5-205.11-PF · Fail

    Prep area hand sink is blocked by a prep table. Ensure hand sink is accessible.

    Wall and Ceiling Coverings and Coatings (C)*
    590.006/6-201.16-C · Fail

    Missing ceiling tile in storage room area. Replace.

  4. Passed

    1 violation item in this inspection

    Walls and Ceilings Attachments (C)*
    590.006/6-201.17-C · Pass

    Provide enclose ceiling in front line that is smooth cleanable and durable 09/02/25 Provide SOP on cleaning schedule for the front line ceiling .Provide Estimate cost for licensed contactor to instail Proper enclose celing in front service line 10/02/25 Provide Documentation from a licensed contractor on the time frame you need for proper enclosed ceiling installed 10/14/25 on Compliance visit The contractor will be installing the ceiling above the front line the week of 10/27 through 10/30 with the work being completed by 10/31. 11/03/2025 the ceiling is done their is piping and sprinkles on the celing please let us know what type of pipe is at the ceiling(sewer waste water). We can provide as much time as needed to complete this work. As we discussed a ceiling must be smooth durable and easily cleanable

  5. Hearing pending

    1 violation item in this inspection

    Walls and Ceilings Attachments (C)*
    590.006/6-201.17-C · Fail

    Provide enclose ceiling in front line that is smooth cleanable and durable 09/02/25 Provide SOP on cleaning schedule for the front line ceiling .Provide Estimate cost for licensed contactor to instail Proper enclose celing in front service line 10/02/25 Provide Documentation from a licensed contractor on the time frame you need for proper enclosed ceiling installed 10/14/25 on Compliance visit The contractor will be installing the ceiling above the front line the week of 10/27 through 10/30 with the work being completed by 10/31. 11/03/2025 the ceiling is done their is piping and sprinkles on the celing please let us know what type of pipe is at the ceiling(sewer waste water). We can provide as much time as needed to complete this work. As we discussed a ceiling must be smooth durable and easily cleanable

  6. Failed

    1 violation item in this inspection

    Walls and Ceilings Attachments (C)*
    590.006/6-201.17-C · Fail

    Provide enclose ceiling in front line that is smooth cleanable and durable 09/02/25 Provide SOP on cleaning schedule for the front line ceiling .Provide Estimate cost for licensed contactor to instail Proper enclose celing in front service line 10/02/25 Provide Documentation from a licensed contractor on the time frame you need for proper enclosed ceiling installed 10/14/25 on Compliance visit The contractor will be installing the ceiling above the front line the week of 10/27 through 10/30 with the work being completed by 10/31. 11/03/2025 the ceiling is done their is piping and sprinkles on the celing please let us know what type of pipe is at the ceiling(sewer waste water). We can provide as much time as needed to complete this work. As we discussed a ceiling must be smooth durable and easily cleanable

  7. Failed

    1 violation item in this inspection

    Walls and Ceilings Attachments (C)*
    590.006/6-201.17-C · Fail

    Provide enclose ceiling in front line that is smooth cleanable and durable 09/02/25 Provide SOP on cleaning schedule for the front line ceiling .Provide Estimate cost for licensed contactor to instail Proper enclose celing in front service line 10/02/25 Provide Documentation from a licensed contractor on the time frame you need for proper enclosed ceiling installed 10/14/25 on Compliance visit The contractor will be installing the ceiling above the front line the week of 10/27 through 10/30 with the work being completed by 10/31.

  8. Failed

    1 violation item in this inspection

    Walls and Ceilings Attachments (C)*
    590.006/6-201.17-C · Fail

    Provide enclose ceiling in front line that is smooth cleanable and durable 09/02/25 Provide SOP on cleaning schedule for the front line ceiling .Provide Estimate cost for licensed contactor to instail Proper enclose celing in front service line 10/02/25 Provide Documentation from a licensed contractor on the time frame you need for proper enclosed ceiling installed

  9. Failed

    3 violation items in this inspection

    Clean-up of Vomiting and Diarrheal Events (Pf)**
    590.002/2-501.11-PF · Pass

    No Caution ape observed in clean up V/D kit. provide

    Maintaining Refuse Areas and Enclosures (C)*
    590.005/5-501.115-C · Pass

    Observed employee scooter store in storage room where employee was prep chicken. Provide area to maintain employee scooter away from food . clean and mantain. rear door observed block with trash can. remove to allowed access.

    Walls and Ceilings Attachments (C)*
    590.006/6-201.17-C · Fail

    Provide enclose ceiling in front line that is smooth cleanable and durable 09/02/25 Provide SOP on cleaning schedule for the front line ceiling .Provide Estimate cost for licensed contactor to instail Proper enclose celing in front service line

  10. Failed

    3 violation items in this inspection

    Clean-up of Vomiting and Diarrheal Events (Pf)**
    590.002/2-501.11-PF · Fail

    No Caution ape observed in clean up V/D kit. provide

    Maintaining Refuse Areas and Enclosures (C)*
    590.005/5-501.115-C · Fail

    Observed employee scooter store in storage room where employee was prep chicken. Provide area to maintain employee scooter away from food . clean and mantain. rear door observed block with trash can. remove to allowed access.

    Walls and Ceilings Attachments (C)*
    590.006/6-201.17-C · Fail

    Provide enclose ceiling in front line that is smooth cleanable and durable

  11. Passed

    1 violation item in this inspection

    Frozen Food (C)*
    590.003/3-501.11-C · Pass

    Chicken labelled keep frozen stored in walk-in cooler @ 36f ensure frozen foods kept frozen

  12. Failed

    1 violation item in this inspection

    Frozen Food (C)*
    590.003/3-501.11-C · Fail

    Chicken labelled keep frozen stored in walk-in cooler @ 36f ensure frozen foods kept frozen

  13. Passed

    1 violation item in this inspection

    (O) Person in Charge-Duties (Pf)**
    590.002/2-103.11-PF · Pass

    no written SOP's for the re-useable customer bowls employee was able to show how the process goes for refilling the customer bowls. Supply SOP's for this process.

  14. Not required

    No violation items attached to this inspection in the city's data.

  15. Failed

    1 violation item in this inspection

    (O) Person in Charge-Duties (Pf)**
    590.002/2-103.11-PF · Fail

    no written SOP's for the re-useable customer bowls employee was able to show how the process goes for refilling the customer bowls. Supply SOP's for this process.

Keep exploring

Official data source

View the official data source

← Back to the search